Excavating
the vertical flow wetland
basin - winter 2003

Constructing
the settling basin - fall 2003

Under-drain
plumbing installed; placing
limestone - summer 2004

Placing
mushroom compost - summer 2004

Installing
cover and deck over flow control
structure - fall 2004

Installing
odor control plumbing - summer 2005